Skip Navigation

Your feedback will help us improve this website.

Option 2 – straight alignment - health centre to be removed

Option  2 would remove the health centre to allow improvements to the alignment of the fire station access road, Albion bend and access to the library. The existing bridge structures over the railway on Maesteg Road would be replaced with an underpass to maintain the Afan Valley cycle way link.

This option provides only some improvements compared to Option No.1 to Maesteg Road, fire station access and Albion bend. No improvement would be achieved at the properties fronting Station Road.

Plans

  • Option 2 - Straight alignment - health centre to be removed (PDF 1.69 MB)

    m.Id: 31878
    m.ContentType.Alias: nptDocument
    mTitle: Option 2 - Straight alignment - health centre to be removed
    mSize: 1.69 MB
    mType: pdf
    m.Url: /media/16901/c20910-ga-option-2.pdf